|
Rule: TRAILER LOAD TRANSFER, AND REFRIGERATED CARGO RECEIVING
|
|
|
Publication Date: 10/25/2004 |
Effective Date: 11/28/2004 |
|
Through Date: |
Expiration Date: |
|
Amendment Code: E, C |
Special Use Number: |
|
Request #: Unknown |
|
$10.00 W/M (as freighted)
$ 7.00 W/M (Montreal only)
(E, C) Eff 11/28/2004
NOTE: 2 all rated above, both METRO FCL and LCL and outside METRO FCL, are subject to an Extra Pick-Up (if requested) at a Minimum $80.00 each.
L) TARPAULIN: If carrier provides a tarpaulin on open top container, consignee shall deposit $500.00 on 20 ft. container and $1000.00 on 40 ft. container, which deposit
will be refundable upon return of carrier's container and tarpaulin or tarpaulin alone if Consignee/Shipper's container, less cost of maintenance and repair, if any, on
the said tarpaulin.
M) Freight Charges assessed on Overflow Freight:
When two or more container are required for a single shipment, each container except the last one shall be loaded to the minimum weight or cubic as shown above
(Rule 15G) and he overflow freight loaded in the last container shall be charged freight on the actual weight or cubic measurement, however, the Carrier reserves the
right to fill out the last container.